The development will consist of the construction of a temporary primary school building, single storey with two classrooms, by way of construction of a prefabricated modular building with associated site works. Retention planning permission is also sought for two existing primary school modular buildings, single storey with two classrooms. Temporary Permission for a period no longer than 5 years is being sought. AI Received 22/05/2025 SAI Rcvd 10/06/2025
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands at 85-93 Main Street, Swords, Dublin, K67X886
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,160 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0150E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The provision of a temporary primary school by way of construction of
Permission for change of use
Permission for change of use of existing the ground floor launderette to a retail off-licence & takeaway coffee hub, minor changes to internal layout, alterations to existing shop front signage and all other associated site works. Gross floor area of change of use 145m2.
A new render finish over the existing brick finish to the existing nor
Retention permission for the subdivision of the restaurant from adjacent dwelling, and minor internal alterations. Additional Information Received 29/01/2026
The full report covers all 2,160 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0150EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report