Planning permission is sought for a development that will consist of the construction of a single storey extension (899.4sqm) to existing school (144.3sqm), minor alterations to existing school & removal of existing temporary accommodation (429 sqm) & storage shed (17sqm); to include 3 no. new classrooms, toilets & ancillary, & new SEN accommodation to include a central activities space, 2 no. class safe bases, toilets & ancillary, with external works to include new car park layout to existing car park (existing 12 no. spaces), 6 no. new car parking spaces & new gates to existing side access, new play areas, hard & soft landscaping & all associated siteworks. AI Received 2nd October 2025 SAI Received 22nd October 2025
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
St. Marys National School, Oldtown, Co. Dublin, A45YD60
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
37% of nearby decided applications were refused. The preview found 353 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0167E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Demolition of existing single storey building, and construction of 1no. new detached two storey 4 bedroom dwelling house with revised vehicular entrance and associated site works. AI received 26/09/24 CAI Rcvd 31/10/2024
Planning permission is being sought for the construction of a single storey extension (10m2 ) to front and side gable of end terrace house.
Retention Planning Permission is sought for alterations to previously approved plans (Reg.Ref. F17A/0357, ABP 300045-17) which relate to the construction of 14 no detached dwellings and associated site works. The following changes are sought (i) Amendments to house types A, B and C to include:- Small increase in floor areas; revised fenestration to front of houses on two floors; conversion of garage to side of house type A to living space; replace apex roofs over ground floor bay window, and first floor bedroom, with flat roofs, (ii) adjustment of internal road network as per Fingal County Council Roads Department, (iii) adjustment of foul sewer manhole locations as per Uisce Eireann mandate.
Permission for 1) The demolition of 1 no. derelict existing dwelling and 3 no, disused shed structures (Total shed area 137.7m²). 2) The construction of a residential development (Total 89 no. dwelling units) consisting of 49 no. 4-bedroom detached dwelling, 18 no.3-bedroom semi-detached dwelling, 16 no. 3-bedroom terraced dwelling, 4 no. 2-bedroom apartment and 2 no. 1-bed apartment with additional 2 no. 4-bed elderly accommodation units, a Crèche and 2 no. commercial units (Total 123m²) and the creation of 2 no. entrances off R122. Add Info received 29th November 2020.
Erect 4no. eighteen-metre-high poles to avail of full floodlight facilities to the existing grass pitch and associated site works.
The full report covers all 353 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0167EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report