Permission for Proposed hipped roof to be built up into dutch hip at attic level with window in gable wall, dormer roof window on rear slope of roof all at attic level, attic conversion with w.c & to habitable room. AI received 09/05/2025
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
2 The Cairn, Clifflands, Rush, Co Dublin, K56VR66
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
26% of nearby decided applications were refused. The preview found 1,029 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0197
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of ground floor
Planning permission for conversion of existing attic space
Permission for the widening of an existing vehicle entrance through the demolition of an existing pier and the construction of a new pier, and all associated site works.
1/ Attic conversion, to include 2no. new Velux rooflights to front, 2 no. new Velux rooflights to rear, and construction of new dormer window to rear. 2/ Removal of hip end roof, and gabling of side elevation with new attic landing window to accommodate same. 3/ Construction of single storey kitchen extension to rear. 4/ Construction of single storey lean-to garage extension to side.
Permission for conversion of existing attic space comprising of modification of existing roof structure, 2 no. roof windows to the rear, new access stairs and side dormer c/w A-style roof and window.
The full report covers all 1,029 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0197The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report