Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Roseville Business Park, Turvey Avenue, Donabate, Co. Dublin, K36 K759

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The preview found 1,570 nearby planning records within 5 km where a location match is available.

Matched source
F25A/0461E
Project type
One-off house
Coverage
5 km radius
1,570Nearby applications
17%Refused
1,306Conditional grants
7Refusal reasons

Top refusal reasons nearby

Design2
Premature Services1
Protected Structure1
Traffic Sightlines1
Visual Amenity1

Nearest similar decisions

F25A/0461E

The development will consist of a prefabricated lightweight metal frame single-storey workshop building (600sq.m) along with rainwater harvesting.

Granted0.0 km16 July 2025
F24A/0295E

1) Alterations and Single Storey Extension to side of existing Industrial Unit by 91sqm, 6450mm High at High Point and 5852mm at Eaves Level, together with All Ancillary Works.

Granted0.1 km22 May 2024
F21A/0062

Permission for a small-scale Waste Electrical and Electronic Equipment (WEEE) and Battery Storage and Transfer Facility, The applicant intends on accepting WEEE and Battery waste from permitted operators at this facility for temporary storage in UN approved containers prior to onward dispatch to authorised WEEE and Battery waste treatment facilities. The applicant intends on accepting a maximum of 520 tonnes of WEEE and Battery waste on-site per annum. A maximum of 20 tonnes of WEEE/Battery will be stored on-site at any one point in time. No on-site processing or treatment of WEEE/Battery waste will be undertaken at this facility. A Waste Facility Permit is required for the proposed activity under Classes 1 and 9 of Part 1 of the Third Schedule of the Waste Management (Facility Permit & Registration) Regulations 2007, as amended. The applicant intends on obtaining such a Waste Facility Permit. AI received 27/07/21

Granted0.3 km19 August 2021
F19A/0011

First floor office space at an existing warehouse unit.

Granted0.3 km04 March 2019
F21B/0030

Retention of changes to approved permission F07B/0430 plus the addition of 1 front (south) facing 1.1 m sq skylight, 4 no. rear (north) facing 1.1 m sq skylights and a rear (north) facing dormer to facilitate attic toilet/shower room 8.6 sqm with new stairs for access.

Granted0.3 km01 April 2021
F19A/0463

Phase 1 of development. Phase 1 consists of (i) Access roads, foul & storm water services, watermain & all associated site works (ii) A detached 947m² Car Showrooms & Service Bays (iii) A detached 467m² Management Unit (iv) A detached 1,387m² Car Test Centre (v) A detached 1,949m² Builders Providers & (vi) A detached 14m² ESB sub-station. Add Info received 19th February 2020. Clarification of Add Info received 5th June 2020.

Granted0.3 km01 July 2020

The full report covers all 1,570 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required