Permission is requested for a new fit-out of first floor area to provide a club/community space for playing board games and to include change-of-use to retail area (28sq/m) and to café area (17sq/m) to sell tea, coffee and snacks for consumption on the premises. Alteration works to include new subdividing partition to create an overall self-contained unit of 217sq/m along with minor internal alterations to existing door & partition layouts. New signage & lighting to front elevation.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 1A & 2A, First Floor Level, Holmpatrick Shopping Centre, Skerries
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
24% of nearby decided applications were refused. The preview found 905 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0470E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of:
Permission for demolition of existing rear single storey conservatory and construction of new single storey extension to rear, new front porch and conversion of attic with removal of chimney and addition of rear dormer window and two rooflights to front.
The construction of a two storey extension to the side and a single st
Construction of a first floor extension over existing converted garage.
Permission to demolish single storey structures to rear, convert garag
The full report covers all 905 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0470EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report