Planning Permission for loft conversion including removal of hipped end of roof and the construction of a jerkinhead roof, with window at loft level in new side elevation also dormer structure with window to rear roof profile and Velux windows to rear and front roof profiles.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
8 Ormond Way, Swords, Co. Dublin, K67 H566
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,537 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0510
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of building (i) a tiled roof one storey bay window and porch at the front of the house (ii) a hip roof dormer with obscured glazing in the roof-hip (iii) a dormer window in the roof at the back of the dwelling (iv) converting the attic space for non-habitable use with stair access from the bedroom landing and (v) all associated internal work, site and drainage works.
A new dormer roof to the side of the existing house roof and all ancil
(1) Replacing the existing hip roof with a 'half-hip' type.
Permission for (1) Hip roof dormer with obscure glazing in existing roof-hip on the side elevation. (2) Roof lights in the roof to the front of the dwelling. (3) Converting the attic space for non-habitable use with stair access from the first floor landing. (4) All associated works.
Construction of an extension to side and rear of dwelling
The full report covers all 1,537 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0510The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report