Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Naul Wastewater Treatment Plant, R108, Naul, Fingal, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

34% of nearby decided applications were refused. The preview found 174 nearby planning records within 5 km where a location match is available.

Matched source
F25A/0578E
Project type
One-off house
Coverage
5 km radius
174Nearby applications
34%Refused
115Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

F25A/0578E

NIS We, Uisce Éireann, intend to apply for permission for development at this site address: Naul Wastewater Treatment Plant, Naul, Fingal, Co. Dublin. The development will consist of upgrades to the existing Naul Wastewater Treatment Plant: - Installation of new Preliminary Treatment, Stormwater Storage Tank, Aeration Tank, Two Secondary Settlement Tanks, Sludge Pumping Station, Sludge Thickener, Flood Protection Berm, Security Fence, PV panels, Attenuation Tank and Oil Interceptor. -Realignment of inlet sewer; -New access road and entrance gate; -Landscaping; - Mechanical, electrical and associated site works; - Demolition of existing Screening, Settlement Tank, Sludge Pumping Station, Sludge Holding Tank; -A Natura Impact Statement has been prepared in respect of this planning application. Additional Information Received 12/11/2025

Granted0.0 km15 January 2026
F18A/0570

Retention pernission of a porta-cabin structure to the rear of the exi

Granted0.2 km05 December 2018
F24A/0615E

Extension of operational hours for childcare facility from that granted under F10A/0530 & F18A/0570 (14:00 - 18:00) to 08:00 - 18:00. AI Rcvd - 27/02/2025

Granted0.2 km26 March 2025
F25A/0711E

The development will consist of the extension of operational hours for childcare facility from that granted under F10A/0530, F18A/0570 & F24A/0615E (from 9:00 to 12:30 & 13:30 to 18:00) to 08:00 - 18:00 inclusive.

Granted0.2 km29 September 2025
F21A/0028

Revisions to previously approved planning permission registration reference F15A/0083 for change of dwelling design, location of dwelling on the site, vehicular entrance location, connections to existing communal watewater treatment system, and SuDS drainage. AI received 21/05/21

Granted0.2 km16 June 2021
F23A/0086

The proposed development will consist ofthe following:

Refused0.2 km28 April 2023

The full report covers all 174 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required