Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 4,765 decisions within 5 km, 4 exact-site or onsite candidate records, and 682 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
682 structured nearby appeal records.
682 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
Conversion of his attic to storage including a dormer widow to the re
Construct a single storey extension to the west side of the existing d
PERMISSION: For the construction of a dormer roof extension to the rear of the existing second floor bedroom and all associated site works at 7 Parkside Boulevard, Balgriffin, Dublin 13.
Construction of a 30.2 sq/m Ground Floor Extension to the rear of existing dwelling and construction of a 3m wide dormer to the rear roof profile.
Permission is sought to raise lower roof to level of existing higher roof and to form additional second floor bedroom with dormer window to front and rear as well as second floor rear stair landing window.
Permission is sought to raise lower roof to level of existing higher roof and to form additional second floor bedroom with dormer window to front and rear as well as second floor rear stair landing window at 4 Parkside Boulevard, Balgriffin, Dublin 13.
The brief summarizes the pattern across all 4,765 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record F25A/1023EThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief