PlanIntelPlanning precedent preview

Planning precedent report

Unit D, Furry Park Industrial Estate, Swords Road, Santry, Dublin 9, D

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

9% of nearby decided applications were refused. The preview found 4,833 nearby planning records within 5 km where a location match is available.

Matched source
F26A/0118E
Project type
One-off house
Coverage
5 km radius
4,833Nearby applications
9%Refused
4,382Conditional grants
8Refusal reasons

Top refusal reasons nearby

Visual Amenity3
Other2
Residential Amenity2
Traffic Sightlines1

Nearest similar decisions

F26A/0118E

Planning Permission for alterations to existing industrial unit including: - an increase in the quantum of office floor area at ground and first floors with an increase of 488 sq.m. of floor area, bringing the total overall building floor area to 4,340 sq.m. Alterations and new finishes to the existing entrance lobby, new internally illuminated signage on the South facade, the provision of a refuse bin enclosure & bicycle shelter and any associated site works. The existing building was granted permission under Registration Reference F95A/0094 and F95A/0853.

Granted0.0 km10 April 2026
F21A/0599

Permission for construction of ESB Substation, client switchroom, and associated site works.

Granted0.1 km16 December 2021
F17A/0693

A 5-storey extension of c. 2,536m² to the rear of the Crowne Plaza Hot

Granted0.3 km28 February 2018
F23A/0048

Planning permission for development on a site of c.1.8 ha located at Crown Plaza Hotel Dublin Airport, Northwood Avenue, Santry Demesne, Santry, Dublin 9, D09 X9X2. The development will consist of the demolition of an existing single storey element (261 sq m) and the construction of a replacement 5 storey extension (18.65 m high to top of plant) of c. 2,686 sq m to the rear of the existing Crowne Plaza Hotel. The development will include a service yard, kitchen and stores at ground floor level, with hotel accommodation above at first to fourth floor levels. The development will also consist of minor internal alteration to the existing hotel accommodation at first to fourth floor levels to accommodate the proposed extension, resulting in the loss of 4 no. bedrooms. The proposed development will result in a total of 269 no. bedrooms (compared to the 209 no. existing bedrooms) and an overall gross floor area of c. 14,277 sq m. The development will also include piped infrastructure and ducting, roof plant, car parking (4 no. new surface level spaces), bicycle parking, green roof, changes in level and all associated site development and excavation works above and below ground.

Granted0.3 km11 April 2023
F18A/0261

Permission for revisions to operation of sports airdrome approved by t

Granted0.4 km05 July 2018
F22A/0044

Planning permission and retention permission for development to the rear of Unit K, Furry Park Industrial Estate, Swords Road, Dublin D09 T6C1. The development consists of planning permission to extend the existing hardstanding to the rear with a new concrete hardstanding comprising truck loading and associated parking area together with an oil drum storage area and associated trench bund. The development also includes for the relocation of the existing container storage to a new location at the rear to facilitate the new arrangement. Retention permission is also sough for a section of concrete hardstanding to the rear adjacent the proposed new hardstanding comprising an area of 147 m2. AI received 10/6/2022 AI deemed significant ** Revised public notices received 22/6/2022

Granted0.4 km19 July 2022

The full report covers all 4,833 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF