Planning Permission is sought for: Conversion of existing attic to storage area, with new dormer window to rear, 1 no. new Velux rooflight to rear, and 2 no. new Velux rooflights to front, to include gabling of existing hipped roof to side, and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
52 Glen Ellan Green, Swords, Co. Dublin, K67 KW08
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
16% of nearby decided applications were refused. The preview found 1,689 nearby planning records within 5 km where a location match is available.
- Matched source
- F26A/0213E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Proposed new gable wall to the side of the existing house and a proposed new flat roof dormer to the rear of the existing house roof and all ancillary works.
Construction of a 2-storey pitched roof living area and bedroom extens
Removal of the existing single storey rear extension and the construction of a new single storey extension to the rear/side of existing dwelling, including new roof lights, minor internal modifications at ground floor level and all associated site works.
Attic conversion to include new dormer roof to rear, gable roof to sid
Permission for alterations to existing hip roof to side to create Dutch gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage with Dormer to rear and ancillary works.
The full report covers all 1,689 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F26A/0213EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report