Planning Permission is sought for: 1/ Retention for demolition of existing dwelling house, and construction of replacement timber framed dwelling house. 2/ Construction of living room extension to replacement timber framed dwelling house. 3/ Installation of waste water treatment system, foul water percolation area, storm water percolation area, and associated site works to facilitate same.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Wimbletown, Ballyboughal, Co. Dublin, A41 V298
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
29% of nearby decided applications were refused. The preview found 541 nearby planning records within 5 km where a location match is available.
- Matched source
- F26A/0250E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
1. Retention for demolition of existing dwelling house, and construction of replacement timber framed dwelling house. 2. Installation of waste water treatment system, foul water percolation area, and assoicated site works to facilitate same.
Permission for single storey extension to side & rear of existing dwelling, minor internal alterations, revised window configuration to front elevation & associated site works.
The development will consist of a dormer style dwelling, advanced waste water treatment system and percolation area, new entrance walls and piers, and all ancillary site development works. Additional Information received 25/07/25
Permission for an amendment to the previously permitted residential development Reg. Ref. F16A/0006 to facilitate the relocation of a ground floor bedroom to the first floor, provision for work at home space at ground floor level, ground floor kitchen extension, front porch and relocation of utility room with associated elevational modifications. The application relates to the permitted dwelling only and does not propose any modifications to the physical site layout, entrance or wastewater treatment plant with percolation area.
The development will consist of the construction of a two-storey detached dwelling, detached garage, the installation of a wastewater treatment system, Eco CoCo filter and gravel distribution bed, proposed entrance off the public road and all ancillary site works. AI Rcvd 07/05/24
Source match
Matched from public planning record F26A/0250EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report