Side and rear two storey extension, front entrance porch, reconfiguration of the roof for attic conversion with roof lights to the rear, new pedestrian access to the rear garden off Ormond Avenue, and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
2 Ormond Close, Mooretown, Swords, K67 N6P6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,534 nearby planning records within 5 km where a location match is available.
- Matched source
- F26A/0302E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Proposed works
Retention Planning Permission for Steel Temporary Container and Canopy. Container measures 2300mm x 2500mm x 3500mm. For the use as a Carwash/Valet Business and new SUDS solution to incorporate rain water collection and permeable paving.
Permission for Retention of Steel Temporary Container and Canopy. Container measures 2300mm x 2500mm x 3500mm. For the use as a Carwash/Valet Business. AI Rcvd 09/01/24 CAI Rcvd 14/3/24
A new dormer roof to the side of the existing house roof and all ancil
Development will consist of a proposed new Dutch hip gable wall & new window to the side of the existing house and a new dormer roof to the rear of the existing house roof and all ancillary works.
The full report covers all 1,534 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F26A/0302EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report