Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Hexagon Building Site, IDA Blanchardstown Business & Technology Park,

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 3,504 nearby planning records within 5 km where a location match is available.

Matched source
FW17A/0237
Project type
One-off house
Coverage
5 km radius
3,504Nearby applications
13%Refused
3,060Conditional grants
31Refusal reasons

Top refusal reasons nearby

Visual Amenity16
Residential Amenity8
Design3
Other3
Zoning Contravention1

Nearest similar decisions

FW17A/0237

1. The proposed extension of the existing 'Hexagon' data storage facil

Granted0.0 km21 February 2018
FW19A/0111

The proposed development comprises of a container compound for the pur

Granted0.1 km09 August 2019
FW25A/0535E

Planning permission is sought for: - Removal of 22 parking spaces to accommodate the proposed development. - Provision of a Battery Energy Storage System (BESS) compound with a total area of c. 553.8 sq.m. comprising four containerised battery units and one electrical transformer. The self-contained battery units will have a maximum height of c. 3 m and will be c. 8.8 m in length and c. 1.65 m in width. The transformer will have a maximum height of c. 3.25 m and will be c. 4.75 m in length and c. 4 m in width. - The proposed battery compound will be enclosed with security fencing to a maximum height of 2.7m with entrance gates along the southern boundary and western boundary. - All associated development including electrical connections, landscaping and planting, boundary treatments, CCTV, lighting, and all associated ancillary works.

Granted0.1 km10 February 2026
FW19A/0161

The proposed development comprises of a container compound for the pur

Granted0.2 km18 November 2019
FW18A/0078

Demolition of an existing industrial building on the subject site wit

Granted0.2 km26 July 2018
FW24A/0214E

We, Grid Beyond Limited, intend to apply for Permission for development at this site address: Keppel Data Centre, 4 Ballycoolin Rd, Ballycoolin, Dublin 15, D15AKK1. The development will consist of the installation of energy storage units at an existing datacentre facility. The energy storage will consist of 4 no. new battery storage units, 2 no. new HV power skids (PCS transformer and HV RMU), 2 no. MV transformer, new security fence of 2.4 meters height including 2 no. new internal gate entrances.

Granted0.2 km02 July 2024

The full report covers all 3,504 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required