Conversion of existing attic storage space to a habitable space to inc
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
14 Rokeby Park, Laraghcon, Lucan, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 2,809 nearby planning records within 5 km where a location match is available.
- Matched source
- FW17B/0101
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Elevational modifications to include new roof windows to the front elevational and all associated site development works.
The removal of a canopy and the construction of a 4 sq.m porch to the front of this existing detached house and all associated works necessary to facilitate the development.
Planning permission for a change of use of attic space to habitable accomodation and retention planning for a detatched conservatory/greenhouse.
Retention permission is being sought for 9m2 of additional occupiable floor area at 1st floor landing level within the existing Chatterbox Childcare facility Rokeby Park, Lucan, Co. Dublin. Planning permission is also sought to increase child numbers previously approved under Planning Reg. Ref FW10A/0155 from 23 to 37at same location for Nexus Educational Hub Ltd.
The development will consist of the provision of a front facing dormer window into existing attic story in the approximate location of existing former window.
The full report covers all 2,809 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW17B/0101The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report