Applications tied to the site
Partial coverage17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 4,337 decisions within 5 km, 17 exact-site or onsite candidate records, and 693 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
17 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
17 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched2 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 matched693 structured nearby appeal records.
693 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
Demolition of esxisting house and the retention of the existing hoardi
The construction of 8 no. houses and associated ancillary works consis
The development will consist of 29 no. dwelling units (14 no. 2 bedroo
The development will consist of the demolition of the existing buildi
The development will consist of the retention of an aluminium framed g
The proposed development will consist of high-power electric vehicle c
The brief summarizes the pattern across all 4,337 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record FW18A/0037The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief