Mezzanine floor approximately 12000mm x 5271mm fully clad to create
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 100, Northwest Business Park, Ballycoolin, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,837 nearby planning records within 5 km where a location match is available.
- Matched source
- FW18A/0142
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention Permission for (1) Revised internal layout of existing ground floor and change of use from light industrial to warehouse use, (2) Addition of first floor infill extension for light industrial use (106m2) and (3) Minor external elevational changes.
Permission for the removal of the existing first floor, comprising of a bar & apartment, and construction of 22 No. guest rooms & 2 No. meeting rooms including all ancillary works and associated elevation alterations arising from the development.
Erection of First Floor Office Accommodation, Staircase, Sanitary Accommodation, Foul Water Drainage and All Ancillary Works on Existing First Floor Concrete Slab within Existing Industrial Unit.
The proposed development will conist of (i) Installation of solar photovoltaic panels and associated fixtures and fittings on the roof of the exisiting commercial building, and (ii) All other associated infrastructure and site developement works.
Go-Ahead Transport Services (Dublin) Limited intends to apply for planning permission for development on this c. 2.1 ha site at Unit 200 Northwest Business Park, Ballycoolin, Dublin 15, D15 K8ND. The development will consist of the change of use of this site from the existing warehouse/logistics facility use to transport depot, including the 2 no. existing buildings, each incorporating internal ancillary offices and related areas (Building 1: c. 5,084 sq m; Building 2: c. 993 sq m). The development will include on site provision for the storage, maintenance and parking of buses (187 no. bus spaces comprising 176 no. designated spaces and 11 no. overnight spaces); ancillary offices and staff facilities (including toilets, changing rooms, canteen, store, meetings and training rooms); bus workshop; external fuel storage tanks, water tanks, refuelling area and bus wash drive-through. The development will also include the provision of a pedestrian entrance adjacent to the main vehicular entrance; the provision of a roller shutter door and ramped access to west of Building 2; surface car parking (including electrical charging points and ducting); motorcycle and bicycle parking; pedestrian pathways; signage; plant, back up generator and water tank; external lighting; hard and soft landscaping; boundary treatments; piped infrastructure and ducting; drainage infrastructure; waste management areas and all ancillary site development works above and below ground. AI Rcvd 26/05/2025
The full report covers all 2,837 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW18A/0142The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report