Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 3,111 decisions within 5 km, 4 exact-site or onsite candidate records, and 349 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
349 structured nearby appeal records.
349 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
Planning Permission is sought for an increase in the annual volume of
Planning Permission to erect 1,795 m2 or 371.68 Kwp of photovoltaic p
The development will consist of upgrade works abd alterations to an ex
The development comprises the construction and operation of 3 no weigh
The development is a wastewater treatment plant comprising a 3m high b
The development will consist of a Battery Energy Storage System (BESS)
The brief summarizes the pattern across all 3,111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record FW18A/0159The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief