Conversion of attic space to existing apartment to habitable accommoda
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Apartment 15, Ashleigh Court, Castleknock, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,303 nearby planning records within 5 km where a location match is available.
- Matched source
- FW18A/0169
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission to erect
The development will consist of four houses; three number two storey
The demolition of the existing dwelling and outbuildings and the construction of four Houses (3 No. three-storey & 1 No. two storey) amendements to site boundary wall, ( to include a realignment of site boundary on adjoining site @ 6 Huntington Lodge Castleknock Road, Dubln 15 D15 VY64) new access roads, pathways piers & walls & associated site works. Additional Information Lodged on 25th Oct 2019 Clarification of Additional Information received on 19th Dec 2019
Retention Permission is sought for front porch and canopy roof, Permission is sought to form new dormer extension to rear and convert attic to store.
Construction of a new two-storey dwelling house and stand-alone shed, accessed via lane from Castleknock Road with 2 no. off-street car parking spaces and including ancillary site works, drainage and landscaping as necessary to facilitate the development. AI received 16/11/21
The full report covers all 4,303 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW18A/0169The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report