Construction of an extension at ground floor and partially at first fl
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
4, Belgree Court, Tyrellstown, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,081 nearby planning records within 5 km where a location match is available.
- Matched source
- FW18B/0089
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of: Construction of a single-storey flat roof outbuilding to the rear of the dwelling and change of use of part of the property to a small- scale preschool / childminding facility with associated toilets, site works, improved pedestrian access and use of existing designated and visitor parking for drop-off and collection. Additional information received 14/03/26 Significant Additional information received 23/03/2026
Permission for construction of a single-storey flat roof outbuilding to the rear of the dwelling and change of use of part of the property to an early intervention preschool for children with autism, with toilets, site works and use of existing designated and visitor parking for drop-off and collection.
Front porch with a parapet style flat roof. Ground floor rear and first floor rear extension. Garage conversion all for extra living space.
Single storey extension to rear (& side) of existing dwelling.
The development will consist of a single storey extension (21 m.sq.) t
The full report covers all 2,081 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW18B/0089The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report