The construction of a single storey extension to the rear and side of
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
11 Ravenswood Rise, Clonee, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 2,609 nearby planning records within 5 km where a location match is available.
- Matched source
- FW18B/0118
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the construction of new seperate singl
Change of use of single storey playroom to playschool/montessori class
For planning permission for the construction of a new 21sq.m. First floor extension to the side with pitched roof to match existing and a 20sq.m. Flat roof ground floor extension to the rear of the existing two storey semi-detached dwelling and to include ancillary works 27 Ravenswood Rise, Castaheany, Dublin 15, D15 K7K8.
Proposed single story utility room extension to side and kitchen exten
The development for which permission is sought consists of construction of a single storey flat roof extension to rear ground floor, conversion of existing attic area including construction of new flat roof dormer structure in rear sloped roof profile, set back from the dwelling footprint perimeters, provision of 2 nr. Veluxes on the front roof elevation, associated internal alterations to facilitate the proposed development together with all ancillary site works & landscaping.
The full report covers all 2,609 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW18B/0118The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report