The development will consist of a 30m multi-user free standing structu
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Spricklestown, The Ward, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 1,190 nearby planning records within 5 km where a location match is available.
- Matched source
- FW19A/0036
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission to erect 4,886.00 m2 of photovoltaic panels on the roof of the dry warehouse building and freezer/chiller warehouse building in our factory with all associates site works. AI received 20/08/21
The development will consist of: revisions to the previously permitted communal facility (93sqm) under Fingal County Council Reg. Ref. FW22A/0167, which includes community space, security office, ancillary storage, covered external social space and associated external areas. These revisions involve interior and exterior modifications to the communal facility and associated external areas, including: (i) Reconfiguration and modification of the internal floor plan to remove the security office and introduce a kitchenette and a meeting room, reducing the total internal floor area from 93 sqm to 66.4 sqm; (ii) Modification to the canopy roof finish from a mono-pitched to a flat roof style, reducing the overall building height from 5.257m to 3.667m (a reduction of c.1.5m); (iii) Reduction of the canopy roof coverage area from c. 606sqm to 405sqm; (iv) Inclusion of dedicated integrated bin store/utilities enclosure (15.5sqm) to serve the communal facility and ancillary site; (v) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vi) Provision of a new vehicular access point to the southeast of the site; (vii) Provision of 10 no. car parking spaces and bicycle parking (5 no. bicycle stands); (viii) Provision of an access laneway to the south of the communal facility; (ix) Revisions to the landscaping to the associated external area and all other ancillary works.
The development will consist of: the provision of c. 72,753sq.m of logistics and associated office uses across 5 no. buildings (Building 1, c. 23,936sq.m and a height of c. 17.25m, Building 2, c. 16,999sq.m and a height of c. 17.2m, Building 3, c. 13,472sq.m and a height of c. 17.25m, Building 4, c. 10,058sq.m and a height of c. 17.25m, and Building 5, c. 8,195sq.m and a height of c. 17.63m), within a business campus setting; associated yard areas, trailer and truck parking together with car and bicycle parking spaces at surface level; a single storey campus management building (c. 93sq.m) with an adjacent canopy and seating area to facilitate outdoor dining / social space; revised and new pedestrian, bicycle and vehicular entrances; internal pedestrian, bicycle and vehicular circulation including a new pedestrian and bicycle link to the R121; associated landscaping, parkland area and public open space, boundary treatments, lighting, signage, CCTV; associated drainage, attenuation and services; and all associated construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI received 12/12/22
The development will consist of: 1: part single storey, part two st
The development will consist of i) a 2nd storey extension to the side
The full report covers all 1,190 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW19A/0036The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report