The construction of a single storey extension to the side and rear of
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Teagasc Ashtown Food Research Centre, Ashtown, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 5,083 nearby planning records within 5 km where a location match is available.
- Matched source
- FW19A/0117
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Development of a residential care houme (nursing home) on lands at Dus
Retention Permission is sought for a 2 storey (4 m x 9 m) extension to rear (north end) also with external steel staircase for access to upper level and all associated works.
Permission is sought for the construction of A) A new canopy over the existing upper astro turf pitches/courts. B) New ancillary administration/support cabin and C) All ancillary site works and services. Additional Information received 22/12/2025 Clarification of Addition Information Received 25/02/2026
Construction of a single-storey building to be used for strength and conditioning. Access/egress from the proposed development is via the existing club entrance on River Road.
Permission is sought for: 1 no. temporary security hut (c. 7.3 sq. m); and 1 no. new, temporary agricultural gate on the existing driveway to prevent construction access to Ashton House and via River Road. Retention permission is sought for 1 no. temporary car parking area (c. 5,000 sq m), with surface layout made up of 150 mm of clean stone, laid on top of permeable geotextile (Terram T1000), laid on topsoil, and contained by temporary perimeter fencing (Harris fence); and temporary construction vehicle access off Ashtown Road via existing gate and driveway to Ashton House. The proposed carpark is a temporary facility (3 years) to serve the construction workers engaged in the construction of the Rathborne Wharf developments (under construction pursuant to Reg Ref. ABP-312262-21 and ABP-309318-21) within the Dublin City Council administrative area immediately to the east of the site. AI received 23/05/2025 Clarification of Additional Information received 22/08/2025
The full report covers all 5,083 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW19A/0117The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report