Planning Permission, for a temporary period of 3 years, for a change of use for part of existing vehicle storage compound to open air retail car sales to include car sales office of 54m sq in a single story temporary cabin structure, also new signage above the portacabin and at front entrance to the site, all at Roundabout beside Joe Duffy Motors, Exit 5 M50 North Road, Finglas, Dublin 11.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Roundabout beside Joe Duffy Motors, Exit 5 M50/North Road, Finglas, Du
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 3,611 nearby planning records within 5 km where a location match is available.
- Matched source
- FW19A/0191
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention Permission for existing vehicle storage compound (1,431 Ha)
Permission for the proposed green energy initiative development consisting of the installation of Photovoltaic Panels on the existing roof structures together with all associated site works
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: - Installation of 12 no. electric vehicle charging bays (11 no. Standard and 1 no. Accessible) replacing 14 no. existing car parking spaces, each comprising a parking space and electric vehicle charging unit on the western side of access road. - Associated revisions to existing car parking area on eastern side of access road consisting of a reduction of the 14 no. existing spaces to 13 no. existing spaces to 13 no. through the removal of 4 no existing car parking spaces and reconfiguration of the adjacent existing landscaped islands. - Installation of electric power units and wire mesh fencing. - Construction of a new modular substation building. - Relocation of existing parking payment terminal. - Installation of new zebra crossing road markings at existing crossing location at northern site application boundary. - All associated lighting, infrastructure and site development works. AI Rcvd 16/11/23 SAI received 28/11/23
The development will principally consist of: the provision of a 3.6 sq m extension along the northern elevation of the building to facilitate a new entrance lobby; opaque vinyl to windows along the western elevation; internal reconfiguration; and all associated site development works.
The erection of two illuminated totem signs approximately 6.5m high x
Source match
Matched from public planning record FW19A/0191The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report