The development consists of conversion of attic to storage use with new dormer roof to Rear facade, extension of roof ridge to form a gable with new window at 2nd floor lovel side facade 2 no. roof lights to front facade (street).
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
29 Castleknock Laurels, Castleknock, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,297 nearby planning records within 5 km where a location match is available.
- Matched source
- FW19B/0145
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission to erect a new 5.2m x 1.85m x 2.8m stainless steel and glass bus shelter with 1 No. double sided internally illuminated advertising panel of 2 Sq. m area per side (4 Sq. m total) located on the public foothpath at Bus Stop No. 1676 Laurel Lodge Road, Opposite 33 Castleknock Avenue, Blanchardstown, Dublin 15. along with all associated site works.
Permission sought for a part single/part two-storey extension to the side a single storey extension to the rear.
The development will consist of a ground floor extension to the side and rear of the existing dwelling incorporating living room, mud room, powder room, utility room & extended dining room.
The development will consist of the retention of existing detached home office to the side of the existing dwelling.
The development will consist of
The full report covers all 4,297 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW19B/0145The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report