Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Bus Stop No. 7217, Diswellstown Road, (north of entrance to The Courty

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 3,840 nearby planning records within 5 km where a location match is available.

Matched source
FW20A/0003
Project type
One-off house
Coverage
5 km radius
3,840Nearby applications
13%Refused
3,346Conditional grants
28Refusal reasons

Top refusal reasons nearby

Visual Amenity14
Residential Amenity8
Design3
Density1
Other1

Nearest similar decisions

FW20A/0003

Proposed new stainless steel and glass bus shelter 5.2 m x 1.85 m x 2.8 m high with 2 no. internally illuminated advertising panels each of 2.0 sq.metre area.

Granted0.0 km10 March 2020
FW20A/0004

Proposed new stainless steel and glass bus shelter 5.2m x 1.85 m x 2.8 high with 2 no. internally illuminated advertising panels each of 2.0 sq. metre area.

Granted0.0 km10 March 2020
FW21B/0140

Permission for retention of existing single storey extension to rear.

Granted0.1 km11 October 2021
FW18A/0178

The development for retention consists of a single storey extension to

Granted0.1 km13 August 2019
FW19A/0061

Retention of change of use from previously approved office use to medi

Granted0.1 km13 September 2019
FW22B/0077

Conversion of their attic to storage including a dormer window to the rear, a ground floor extension to the rear and a ground floor extension to the site.

Granted0.2 km08 August 2022

The full report covers all 3,840 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required