A single storey temporary modular structure extension (133 msq) to the existing Sport HQ Building (Previously the Marine Institute Building) for a period not greater than 10 years. The works will comprise;- open plan/cellular office and meeting spaces (114 m sq); an interlink corridor (19msq); and all associated site development, hard landscaping, and excavation works above and below ground.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Sport Ireland National Sports Campus, Snugborough Road, Blanchardstown
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 3,859 nearby planning records within 5 km where a location match is available.
- Matched source
- FW20A/0012
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
New entrance area at the National Indoor Arena; alterations to existing vehicular access, provision of some 200 no car parking spaces including disabled spaces and 5 no. EV charging spaces; provison of 200 bicycle spaces, and enhanced landscaping at the National Indoor Arena, National Sports Campus, Blanchardstown, Dublin 15.
The National Sports Campus Development Authority ('the NSCDA') intends
A single storey temporary modular structure extension (122m²) to the side of the Irish Institute of Sport (IIS) building (A Protected Structure), (formerly the Central Meat Control laboratory) for a period not greater than 7 years. The work will comprise: open plan/cellular office and meeting spaces (115m²); an interlink corridor (7m²) and all associated site development, hard and soft landscaping and excavation works above and below ground.
The development will consist of
The development will consist of the retention and extension of the duration of the previously permitted 162m2 single storey detached prefabricated temporary office building (planning ref FW18A/0006) for an additional 7 years from the date of expiry of the prior permission; and for its use to be extended to include all office purposes associated with the National Sport Campus. No works are proposed to the protected structure Abbotstown House as part of the development.
The full report covers all 3,859 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW20A/0012The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report