Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Unit D7 Horizon Logistics Park, Harristown, St Margaret's, Swords, Co

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 2,738 nearby planning records within 5 km where a location match is available.

Matched source
FW20A/0034
Project type
One-off house
Coverage
5 km radius
2,738Nearby applications
10%Refused
2,458Conditional grants
3Refusal reasons

Top refusal reasons nearby

Other2
Visual Amenity1

Nearest similar decisions

FW20A/0034

The proposed development will consist of the construction of a standalone Sprinkler Tank & pump house within the existing service yard and associated site services works on an application site of 0.691 hectares

Granted0.0 km09 June 2020
FW23A/0097

Killick Aerospace Limited is applying for planning permission at Unit N3 Horizon Logistics Park, Swords, Co. Dublin. The works will consist of internal modifications to existing Unit N3 (reg ref. FW20A/0187) to include alterations to existing office space at ground floor plus new mezzanine to warehouse.

Granted0.1 km01 June 2023
F17A/0724

A new ESB sub-station & switch rooms plus associated site development

Granted0.2 km25 January 2018
F19A/0033

The erection of a warehouse/logistics unit (D8 14,933m²) on its own se

Granted0.2 km03 May 2019
FW19A/0097

The proposed development comprises the change of use of the existing U

Granted0.2 km07 August 2019
FW21A/0180

The proposed development consists of the following: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit P1) with a gross floor area (GFA) of 6,593 sq.m. (including 1,064 sq.m. o ancillary office space and reception areas over two levels). The proposed building will have a maximum height of 11 metres. Provision of 66 no. car parking spaces, 2 no. motorbike parking spaces, 33 no. bicycle parking spaces, 26 no. van parking spaces, and 30 no. HGV parking spaces. Provision of an ESB substation and switchroom (36m2), security hut (18m2) 3 no. cycle shelter structures, 2 no. smoking shelters, bin store (10m2), recycling store (17m2), a standalone maintenance/services building (67m2). Provision of service yard and HGV and van loading/unloading areas with associated loading bays to the north, south and west of the proposed warehouse/logistics building. Provision of access arrangements to the proposed development including an extension of permitted Estate Road Number 2, connecting to the road infrastructure permitted under Reg Ref FW20A/0187, along with pedestrian/cycle infrastructure to Estate Roads Number 2 and 3. Provision of signage zones and stand-alone totem sign associate with the proposed unit. The proposal includes landscaping and planting, boundary treatments, site lighting, 3 no. flag poles, security fencing and gates, and all associated site services and development works including underground foul and storm water draingage network and sustainable urban drainage systems. The proposed development is located to the sought of the development permitted under Reg. Ref. FW20A/0187 (known as Site N development). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application. AI received 20/12/21

Granted0.3 km22 February 2022

The full report covers all 2,738 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required