Provision of a drying room and 9 additional bicycle spaces, which will necessitate the relocation of 2 no. car parking spaces and the removal of 2 no. car parking spaces at basement level.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site 15A, Tyrrelstown Link Road, L3095, Blanchardstown Corporate Park,
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 3,021 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0056
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The provision of 2 no. self-illuminated external signs, one each to the north-east and south east elevation.
The development will consist of: Modifications to a previously permitted development (Reg. Ref. FW18A/0054) to include a change of use at ground floor level of 'Block B' from office to gym (514 sq.m) and office to cafe (127 sq.m) with associated internal alterations; minor elevational changes; and the reallocation of car parking and cycle parking spaces to the proposed new uses located at basement and surface level, and all associated works above and below ground.
For an amendment to the Condition 2 (ii) of the Notification of Grant
The Development will consist of the construction of 2 no. office build
Planning permission for the provision of 1 no. self-illuminated external sign to the South-East elevation.
The full report covers all 3,021 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW21A/0056The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report