Permission for a storage compound comprising 3 no. storage buildings 0f 273m2, 206m2, and 137m2 respectively (616m2 total), perimeter fencing, hardstanding areas and all associated site development, hard/soft landscaping, site lighting and excavation works above and below ground.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Lands to the west of the National Aquatic Centre (NAC), Sport Ireland
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 3,734 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0130
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Minor amendments to the elevations and surrounding landscape of the previously permitted storage compound (Planning Ref. FW21A/0130). No additional floor area is proposed as part of this development.
Permission for the construction of a single storey kitchen extension t
Single storey extension to side and rear of existing dwelling & all as
Development will consist of a proposed new first floor extension to the rear of the existing house and all ancillary works.
Permission for construction of single storey extension of floor area of 268 sqm and of associated site works, to provide sport related facilities for use primarily by Hockey Ireland, at the northern end of the existing single storey Multi-Sport Pavilion.
The full report covers all 3,734 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW21A/0130The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report