Change of use of existing pharmacy into an Italian chip shop/takeaway, signage and all associated works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 3, Castleknock Village Shopping Centre, Castleknock, Dublin 15
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 4,418 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0133
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development to be retained comprises the construction of a 1.52m high block wall running to a length of 9m on the service station's eastern boundary. The proposed development will consist of increasing the height of the as constructed wall by 0.28m to bring it to a total height of 1.8m.
Full Planning Permission for the removal of two existing Myo's pub signboards and three existing flagpoles, to replace a single Myo's pub signboard (digital). Additional Information Lodged on 12th May 2020
The development will consist of/consists of:- Block A Unit 1: The chan
Revisions/Modifications to the permitted scheme granted under Reg Ref
Block C permission is sought for revised opening hours from those under condition 13 of reg Ref FW16A/0006/Bord ref PL06F.247458 for Block C (Lidl Supermarket) to operate from 08.00 hrs to 22.00hrs Monday- Saturday and 09.00hrs to 21.00hrs on Sunday. Part of this site is located within the Castleknock Village Architectural Conservation Area.
The full report covers all 4,418 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW21A/0133The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report