Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m²; 1 no. single storey ESB MV Substation with a floor area of 33m², 1.8m & 2.4m high fences, fuelling dispensers, forecourt, fuel totem, access to existing private road and associated ground works. AI received 10/12/21
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Food Central, Kingstown, St Margaret's, Co. Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,488 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0136
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of changes to previously granted temperature-controlled warehouse (planning ref FW22A/0136) Namely 1. Removal of parapet from main warehouse. 2. Revised size of proposed signage 3. New external maintenance stairs to the side elevation to include all associated site development works.
The development will consist of a new temperature-controlled warehouse incorporating ancillary offices and storage areas and staff facilities, ESB substation, solar PV panels, loading area with associated dock levellers, hard and soft landscaping, boundary treatments, new vehicular entrance, Access controlled gate, car parking, bicycle parking, HGV parking spaces, trailer parking spaces, lighting, signage, and all associated site development works. AI received 10/10/2022
The development will consist of Retention permission for 1) Truck wash and associated plant room 2) Security hut 3) Amendments to internal office and staff accommodation layouts from previously granted planning ref FW22A/0136 4) and minor changes to landscape scheme previously granted planning ref FW22A/0136 And Planning Permission for • a new temperature-controlled warehouse incorporating ancillary offices and staff facilities, solar PV panels, roof smoke vents, loading area with associated dock levellers, high level covered link to existing warehouse and all hard and soft landscaping, boundary treatments, external lighting, LED signs, external roof access stairs and all associated site development works.
Planning permission for the retention
The development will consist of a designated EV charging hub and access road, consisting of 8 no EV charging bays ( inclusive of 1 no. accessible bay) in phase 1 and 6 no. EV charging bays in phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development.
The full report covers all 1,488 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW21A/0136The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report