A 10-year permission. The development will consist of the construction of: Site works comprising of the following: widening of existing site entrance, expansion and alterations of the site road network incuding relocation and expansion of staff / visitors carparking A single storey epansion of the existing Raw Materials warehouse (Goods-in) to the North of the existing warehouse building, 455m2 x 11.3m high A single storey expansion of the existing Finished Goods warehouse (Dispatch) to the west of the existing warehouse building, 494m2 x 11.25m high A two storey R&D Laboratory building to the north of the proposed Finished Goods warehouse. 333m2 x 11.25m high. A Single storey expansion of existing offices, canteen and locker rooms to the east. 263m2 x 4.4m high A three storey Product Finishing building to the west of the existing production building 1,053m2 x 16.0m high. A two storey expansion of the existing Engineering Offices and tool room to the south of the existing 8uilding. Area, 282m2 x 6.45m high The addition of a 30m3 chemical storage tank in the existing tank farm. The provIsion of a contractors compound area to include contractor car parking area to the West of the site. And all associated works including alterations and additions to the existing external plant, equipment, underground services, external site works such as internal access roads, footpaths, laydown areas, hardstanding areas, external lighting, etc. Provision of a temporary Construction entrance from the Damastown Road The development will be carried out within the 1.607 Hectares of lands containing the Clarochem Ireland Ltd faclity at Damastown Industrial Park. The proposed development involves the modification of an establshment to which the European Communities (Control of Major Accident Hazards Involving Dangerous Substances) Regulations, 2015 (SI 209 of 2015) apply and is also subject to an lndustrial Emissions Licence (IEL). AI received 7/4/2022 AI deemed Significant ** Revised public notices received 21/4/2022
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Clarochem Ireland LTD, Damastown Industrial Park, Damastown Rd, Damast
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,147 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0205
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of: 1) Ste works comprising of the following; widening of existing site entrance, expansion and alterations of the site road network including relocation and expansion of staff / visitor's car parking; 2) A single storey expansion of the existing Raw Materials warehouse (Goods-in) to the North of the existing warehouse building, 455m2 x 11.3m high; 3) A single storey expansion of the existing Finished Goods warehouse (Dispatch) to the west of the existing warehouse building, 494m2 x 11.25m high; 4) A two storey R&D Laboratory building to the north of the proposed Finished Goods warehouse, 333m2 x 11.25m high; 5) A single storey expansion of existing offices, canteen and locker rooms to the east, 263m2 x 4.4m high; 6) A three storey Product Finishing building to the west of the existing production building, 1.053m2 x 16.0m high; 7) A two storey expansion of the existing Engineering Offices and tool room to the south of the existing Building. Area, 282m2 x 6.45m high; 8) The additional of a 30m3 chemical storage tank in the existing tank farm; 9) The provision of a Contractors compound area to include contractor car parking area to the West of the site; 10) And all associated works including alterations and additions to the existing external plant equipment, underground services, external site works such as internal access roads, footpaths, laydown areas, hardstanding areas, external lighting, etc; 11) Provision of a temporary Construction entrance from the Damastown Road. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. The proposed development involves the modification of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (SI 209 of 2015) applies and to an activity requiring an Industrial Emissions Licence (IEL). AI received 28/10/2022
Proposed development involves upgrade of the main entrance to include a new dedicated vehicular entrance, new pedestrian and cyclist access, 6-bay visitor drop-off and check-in zone, designated truck check-in area, new footpaths, landscaping and associated site works. New colour render finish to existing Security Building and brick feature walls at the entrance. New colour paint finish to the Engineering building. New corporate and directional signage to site entrance. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0007-03). The application relates to the provision of an establishment to which the Major Accident Regulations apply.
Astellas Ireland Co. Ltd seeks retention planning permission for a
The development will consist of alterations to the North and East facades of the existing production building to include the removal of 2 roller shutter doors, the addition of 3 no. windows at ground floor level, the addition of a single storey 12m2 storage area and 4 no. condenser units on the North Elevation and the addition of 3 no. condenser units and 3 no. louvred grilles on the East Elevation.
Provision of 1444m2 of photovoltaic (PV) solar panels at second floor roof level of an existing Part 2 storey, Part 3 storey building. Add info received 17th November 2020.
Source match
Matched from public planning record FW21A/0205The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report