The installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 6245m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit D2 Horizon Logistics Park, Harristown, Swords, Co. Dublin, K67 A5
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 2,595 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0036
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of a further extension (3,623m²) to a pre
The erection of a warehouse/logistics unit (D8 14,933m²) on its own se
Amendments to the warehouse/logistics building (D3) permitted under Re
Three illuminated 'Bunzl' identity signs and various other non-illuminated locational and directional signs.
Permission for the construction of 1 no. warehouse/logistics building
The full report covers all 2,595 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW22A/0036The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report