The demolition of existing 2 storey dwelling and single storey shed and construction of 6 no. semi-detached houses comprising of 2 no. 4 bed, 3 storey dormer houses, 2 no. 5 bed, 3 storey dormer houses and 2 no. 3 bed, 2 storey houses, new relocated road entrance, new boundary walls and all associated siteworks. AI Received 19-01-2023 SAI received 31/01/23
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Danell House, Main Street, Blanchardstown, Dublin 15.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 3,994 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0110
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the change of use from Financial Services and Realty Office to Dental Practice, internal alterations to building, new signage to front and side elevations and for all associated site works and services.
The construction of an extension to the side of existing dwelling, at first floor level including changes to the elevations and for all ancillary site works.
Permission is sought for retention of
The demolition of part single, part two storey building & single storey sheds and the removal of containers within the site; construction of a part 4 storey and part 5 storey Nursing Home with a total gross internal floor area of 5,916 sq.m. and comprising 115 no. single bedrooms with communal living spaces, dining areas, shared communal facilities, treatment rooms, kitchen and general administrative areas, staff areas and maintenance spaces. The existing low boundary wall to Main Street is to be demolished and replaced with a new low wall, metal railing and piers. The existing southern entrance to the site from Main Street will be retained and widened. The existing middle entrance to the site from Main Street will be closed up and a new entrance from Main Street will be formed at the northern end of the site to suit the new layout. There will be a new RC retaining wall at the boundary to the adjoining properties on the north side of the site. The existing bus stop & ESB pole will be repositioned to improve sight lines at the southern entrance to the site and the existing bus shelter will be replaced with a new bus shelter. The development will also comprise an ESB substation, plant room, an external bin store and an external backup generator, 15 no. surface car parking spaces at grade (including 1 no disabled car parking space and 3 no. electric vehicle charging spaces), 2 no. surface motorcycle parking spaces at grade, a covered bicycle stand catering for 4 no. short stay visitor bicycle parking spaces at grade at the main entrance to the nursing home, a secure covered bicycle stand catering for 16 no. long stay staff bicycle parking spaces in total at grade, a 1.2m wide x 2.2m high totem sign at the new entrance from Main Street at the northern end of the site, way finding signage, and all associated site, landscaping and infrastructural works, including tree planting, boundary treatments, street lighting, internal roadways, footpaths and shared surfaces, foul and surface water drainage, and potable water supply necessary to facilitate the development; A Natura Impact Statement (NIS) has been prepared and is submitted to the planning authority with the application. The Natura Impact Statement (NIS) is available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the Planning Authority. Retention is sought for an existing reinforced concrete retaining wall along the site boundary with the Tolka River. AI Received 29/10/2024
The development will consist of single storey extension with habitable
The full report covers all 3,994 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW22A/0110The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.