Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Coldwinters, North Road, Finglas, Dublin 11.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,239 nearby planning records within 5 km where a location match is available.

Matched source
FW22A/0132
Project type
One-off house
Coverage
5 km radius
3,239Nearby applications
11%Refused
2,897Conditional grants
11Refusal reasons

Top refusal reasons nearby

Residential Amenity4
Visual Amenity4
Other3

Nearest similar decisions

FW22A/0132

The construction of a single storey extension to the rear and side of an existing light industrial/warehouse unit. The development will include ancillary offices, staff toilets, trade counter/display area, carparking, elevation signage on the front elevation and all necessary site works. Demolition of a double single storey flat roofed domestic garage building is also included.

Refused0.0 km16 August 2022
F18A/0683

Permission for a new shed (floor area 180m²) for horticultural related

Granted0.2 km31 January 2019
FW23A/0111

We Rathdrinagh Land Unlimited Company (Trading as Irish Recycling LTD) intend to apply to the aforementioned Planning Authority for permission for development on lands at Huntstown Townland and Coldwinters Townland, Co Dublin. The development will consist of the construction of a Materials Recovery Facility along with a Food Container Cleaning Plant. The development is phase one of the Huntstown Circular Economy Hub and will include for the following works: 1. The development will consist of the erection 2no. separate buildings and associated site area for use as a Circular Economy Hub. 2. The processes to be carried out within the Materials Recovery Facility building include for the sorting of range of wastes into recoverable and recyclable streams. Recoverable wastes to processed will include for potential recyclables. This building will include for an external odour control plant with associated flue. 3. The processes to be carried out in the Food Container Cleaning Plant building will provide a centralised washing/sterilisation facility for large food retailers in the area to facilitate re-use of containers. 4. The 2no. buildings to be constructed wil incorporate ancillary office and staff facilities along with solar PV panels and signage. 5. The development of associated access roads, turning/loading areas, footways, parking areas, electric vehicle charge points, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 6. The provision of an ESB substation. 7. The provision of ancillary external storage areas. 8. The reprofiling of existing ground levels within the site and associated works to include for infilling and reprofiling of lands within the overall site area. 9. The provision of a new site entrance with associated works to facilitate vehicular and pedestrian access along with associated upgrade works to the adjacent public road to include for provision of footpaths and cycle paths. 10. The provision of a weighbridge and associated staff building at the entrance. 11 The provision of perimeter fencing and security gates. 12. The provision of all associated hard and soft landscaping works. 13. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass petrol interceptor. 14. All ancillary site development, landscaping and construction works to facilitate foul; water and service networks. The Materials Recovery Facility will require an EPA Industrial Emissions Licence. An Environmental Impact Assessment Report (EIAR) has been prepared and accompanies this application. AI Rcvd 18/12/23

Granted0.3 km20 February 2024
FW25A/0076

Intend to apply for the change of use of an existing 22-metre-high redundant pylon structure to provide for a new telecommunications structure. Development to include permission for modifications to the pylon, the addition of an 8-metre-high extension, and installation of antennae, dishes and ancillary equipment (resultant height of structure to be 30 metres; overall height with antennae not to exceed 31 metres).

Granted0.3 km24 April 2025
FW22A/0233

Permission for the installation of solar panels over the roof of an existing telecommunications cabin (covering an area of 59 sq.m. to a maximum height of 5.6m). Works to consist of all ancillary development works, including steel uprights. AI Received 12/01/2023

Granted0.4 km30 January 2023
FW20A/0063

The construction of a single storey 5,000m2 research and development building, which will specialise in developing pilot scale circular economy solutions for a range of discarded resources; including associated office and welfare facilities. The development includes fencing and boundary treatment, signage, internal access roadways and a site entrance. Permission is also sought for all associated site works and services. AI deemed significant 01/04/21 Revised notices received 19/04/21

Refused0.4 km13 May 2021

The full report covers all 3,239 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required