The works will consist of the construction of a two storey special needs accommodation unit (997sqm.) to side of existing school to include a central activities space, 5 No. classrooms, toilets and shower areas and ancillary spaces with minor alterations to existing school facade at ground and first floor to facilitate connection to the extension. External works will include 12 No. additional parking spaces, play area (200sqm) and sensory garden (100 sqm) together with all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Powerstown Educate Together National School, Powerstown Road, Tyrellst
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,586 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0287
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Previously granted under Planning Registered Reference FW22A/0287, the works will consist of the construction of a two-storey special needs accommodation unit, with an area of 1,005sqm. An increase of 8sqm. from the previously granted planning area of 997 sqm. Located to the west side of the existing school to include a central activities space, 5 No. classrooms, toilets, shower areas, ancillary spaces with minor alterations to the existing school facade at ground and first floor to facilitate connection to the extension. Further to the original granted planning permission is the inclusion of 1 additional ground floor window facing north and 4 roof windows and minor amendments to the proposed roof. External works will include 12 No. additional parking spaces, play area (200sqm) and sensory garden (100sqm) together with all associated site works.
Construction of a new single storey ESB Substation and all ancillary s
The development consists of modifications to the development permitted under FW16A/0181 for the construction of a Place of Worship. The modifications consist of reconfiguration of the internal layout of the building at ground floor including the lobby area, bathrooms, family rooms and the addition of 3no. new staircores providing access to a new proposed balcony level within the building envelope. The balcony level will accommodated 457 seats along with storage and plant areas. The number of worshippers within the building will increase from c.744 to c.1201. There are minor modifications to external elevations to incorporate the new proposed balcony at 1st floor level and minor alterations to the internal road layout. The height of the building landscaping/boundary treatment, car parking provision and vehicular access point remain as permitted under FW16A/0181.
Minor amendments to existing planning approvals (FW16A/0181; FW18A/0103; FW19A/0212). The development shall consist of the provision of new vehicle & pedestrian entrance gates (to remain open during the adjoining school term hours) and associated fencing; amended external finishes; amended external entrance canopy; extended louvre screening at first floor level; and the retention of minor elevation adjustments, a revised fire escape stairs enclosure and a new retaining wall on the east boundary of the site.
The development consists of modifications to the development permitted under FW16A/0181 for the construction of a Place of Worship. The modifications consist solely of the change of use of 5 no. ancillary community rooms (total 207m2) to education use. AI Rcvd 06/02/24
The full report covers all 2,586 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW22A/0287The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.