Warehouse extension of existing development at our site 203 Northwest Business Park - Proposed 434sqm Warehouse extension (12.64m high) to the southern elevation side of existing warehouse. Change of use of 20sq m of existing warehouse ground floor area to additional ancillary staff facilities. Associated site landscaping enhancement plus new pedestrian entrance and rearrangement of car parking spaces including 1 No. disabled parking space, 2 No electric vehicle parking spaces and sheltered bicycle parking spaces plus relocation of existing surface water drainage to facilitate the warehouse extension. AI received 27/02/23
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site 203, Northwest Business Park, Blanchardstown, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 3,051 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0296
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The proposed development will consist of the addition of a new first floor window opening to match existing and a new door opening at ground level to the East (Front) building elevation. Internally, carry out works and modifications to extend the existing offices to include new staff facilities, storage room, circulation routes and a new fire escape stairwell and enclosure at ground floor level all amounting to 85sqm. Works to include for all associated ancillary site works.
We LEMAP Ltd, intend to apply to Finagal County Council for Full Plann
The development will consist of extension warehouse at the front of the building, construct 2nd floor level over existing 1st floor offices for use as canteen and boardroom areas to include an additional stairs and modifications to existing elevations. The development also include construction of mezzanine floor in part of the existing warehouse area for storage, modifications and extension to the existing car parking area, erect new boundary wall with railing on top, security gates to existing entrance of car park and all associated site works.
Planning Permission for proposed development will comprise; the construction of a detached single storey building for use as a telemetry workshop and ancillary accommodation, 1 No. bin store, 1 No. smoking shelter, 1 No. bicycle shelter, 2 No. vehicular parking spaces, 1 No. set down area, together with all associated site works (including modifications to existing vehicular entrance).
Go-Ahead Transport Services (Dublin) Limited intends to apply for planning permission for development on this c. 2.1 ha site at Unit 200 Northwest Business Park, Ballycoolin, Dublin 15, D15 K8ND. The development will consist of the change of use of this site from the existing warehouse/logistics facility use to transport depot, including the 2 no. existing buildings, each incorporating internal ancillary offices and related areas (Building 1: c. 5,084 sq m; Building 2: c. 993 sq m). The development will include on site provision for the storage, maintenance and parking of buses (187 no. bus spaces comprising 176 no. designated spaces and 11 no. overnight spaces); ancillary offices and staff facilities (including toilets, changing rooms, canteen, store, meetings and training rooms); bus workshop; external fuel storage tanks, water tanks, refuelling area and bus wash drive-through. The development will also include the provision of a pedestrian entrance adjacent to the main vehicular entrance; the provision of a roller shutter door and ramped access to west of Building 2; surface car parking (including electrical charging points and ducting); motorcycle and bicycle parking; pedestrian pathways; signage; plant, back up generator and water tank; external lighting; hard and soft landscaping; boundary treatments; piped infrastructure and ducting; drainage infrastructure; waste management areas and all ancillary site development works above and below ground. AI Rcvd 26/05/2025
The full report covers all 3,051 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW22A/0296The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report