Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

North City Business Park (ie lands north of Cappagh Road), Cappogue, F

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 3,768 nearby planning records within 5 km where a location match is available.

Matched source
FW23A/0050
Project type
One-off house
Coverage
5 km radius
3,768Nearby applications
10%Refused
3,380Conditional grants
9Refusal reasons

Top refusal reasons nearby

Other3
Residential Amenity3
Visual Amenity3

Nearest similar decisions

FW23A/0050

We Rohan Holdings Ltd, intend to apply for Planning Permission for Amendments to the works permitted under Reg Ref: FW22A/0143 including the amalgamation of the units and a part change of use to provide for maintenance of vehicles. Amendments to the layouts include the reduction in width and increase in depth of the overall building, the removal of the loading docks, the addition of a rear lean-to within the service yard to incorporate an open storage area and wash bay, and minor modifications to the internal layout resulting in an additional 230 square meters of floor area. Amendments to the elevations includes five grade doors to the side and 3 grade doors to the rear. Amendments to the site include a reduction in parking and associated site development works on a 0.98 hectare site at North City Business Park (ie lands north of Cappagh Road), Cappogue, Finglas, Dublin 11

Granted0.0 km27 April 2023
FW25A/0528E

Additional mezzanine floor area within an existing warehouse unit and adding a new external prefabricated unit, adding a total of 989 sqm to the existing warehouse unit area, upgrade of the rear boundary fence and gates to the east and west with 2no heavy duty sliding gates and visual reduced look through fencing, and solar panel areas (approximately 1531 sqm) at roof level and all associated site development works on a 0.98 hectare site at North City Business Park, Cappoge, Finglas, Dublin 11 at units A4a and A4b Additional Information Received 19/03/2026

Granted0.0 km14 April 2026
FW22A/0220

The development will consist of partial change of use of Unit A5A, as constructed under Reg Ref FW21A/0049, from Warehouse to Office use (622 sqm) to include for internal alterations and extension of current office floor areas on ground and first floor level. AI Received 23/11/22

Granted0.1 km15 December 2022
FW22A/0143

A building with 2 no single storey semi-detached

Granted0.1 km06 September 2022
FW21A/0049

The proposed development will consist of a building with 2 No. single storey semi-detached industrial and/or warehouse units with two-storey ancillary offices and an internal ESB substation. All ancillary site development works to include trucking yard to rear, underground duct work, drainage, utility services, car parking, landscaping, cycle shelter and signage to the proposed units form part of this application. The building has a gross floor area of 4,011 square meters on a 0.9 hectare site.

Granted0.1 km06 May 2021
FW25A/0030E

The development will consist of the provision of a single storey building (up to a maximum height of c. 14.1m) (with canopied area) comprising a motor sales showroom (with ancillary offices, staff and customer facilities and ancillary spaces) and a service garage/workshop (and associated ancillary spaces) with a total gross floor area of c. 2,513 sq.m., detached valeting and wash bay facilities, and a standalone ESB substation and switchroom (c. 22 sq m). The development will also comprise: illuminated signage on the northern, southern and eastern elevations (c. 20.02 sq m, c. 15.22 sq m and c. 14.42 sq m, respectively); a free-standing double-sided illuminated pylon sign (c. 14.4 sq m); 3 No. flag poles with double-sided flags on each (c. 32.4 sq m total); alterations to the land's existing entry/exit point onto North City Business Park estate road and 2 No. entry/exit points onto an existing access road to the site's western boundary (constructed under FCC Reg. Ref. FW22A/0143, which was subsequently amended by FCC Reg. Ref. FW23A/0050); customer and staff car parking; motorcycle parking; bicycle parking; new and used vehicle display parking; vehicle storage area and service parking; electric vehicle charging points; fuel dispense area; green roofs; associated lighting; hard and soft landscaping including the provision of boundary treatments, gates, fencing, walls and bollards; SUDs measures; associated site servicing (foul and surface water drainage and water supply); ancillary plant; and all other site excavation and development works above and below ground.

Granted0.1 km20 March 2025

The full report covers all 3,768 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required