The development will consist of changes to previously granted temperature-controlled warehouse (planning ref FW22A/0136) Namely 1. Removal of parapet from main warehouse. 2. Revised size of proposed signage 3. New external maintenance stairs to the side elevation to include all associated site development works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Food Central, St Margarets, Co.Dublin (Townland Kingstown)
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
15% of nearby decided applications were refused. The preview found 1,490 nearby planning records within 5 km where a location match is available.
- Matched source
- FW23A/0161
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of a new temperature-controlled warehouse incorporating ancillary offices and storage areas and staff facilities, ESB substation, solar PV panels, loading area with associated dock levellers, hard and soft landscaping, boundary treatments, new vehicular entrance, Access controlled gate, car parking, bicycle parking, HGV parking spaces, trailer parking spaces, lighting, signage, and all associated site development works. AI received 10/10/2022
The development will consist of Retention permission for 1) Truck wash and associated plant room 2) Security hut 3) Amendments to internal office and staff accommodation layouts from previously granted planning ref FW22A/0136 4) and minor changes to landscape scheme previously granted planning ref FW22A/0136 And Planning Permission for • a new temperature-controlled warehouse incorporating ancillary offices and staff facilities, solar PV panels, roof smoke vents, loading area with associated dock levellers, high level covered link to existing warehouse and all hard and soft landscaping, boundary treatments, external lighting, LED signs, external roof access stairs and all associated site development works.
Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m²; 1 no. single storey ESB MV Substation with a floor area of 33m², 1.8m & 2.4m high fences, fuelling dispensers, forecourt, fuel totem, access to existing private road and associated ground works. AI received 10/12/21
The development will consist of a designated EV charging hub and access road, consisting of 8 no EV charging bays ( inclusive of 1 no. accessible bay) in phase 1 and 6 no. EV charging bays in phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development.
The developement consist / will consist of the following: 1. Retention permission is sought for: a) Extension to as-built Farm Shop (Reg. Ref. F15A/0564) consisting of cafe area of 34.24 sqm together with outdoor seating area. Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development; and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces (in addition to 25 no previously approved under F15A/0564). 2. Planning permission is sought for: a) Change of use from existing store to cafe seating area to southern end of existing building. b) A 215.53 sq. meter extension to existing Farm Shop and Cafe, together with outdoor seating area. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and ancillary areas, lobby, cafe seating, plant rooms and bin store to the eastern side of existing building; ii) Meeting room, staff facilities, storage facilities and 1 additional female toilet in addition to existing toilet facilities to the western side of existing building; iii) New entrance lobby to the northern side of existing building. c) Associated signage for proposed development. d) PV solar panels to roof of building. e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces, 20 no bicycle spaces and a delivery van set-down area. f) A designated EV charging hub and access road to the northern end of the site consisting of 8 no EV charging bays (inclusive of 1 no. accessible bay) in Phase 1 and 6 no. EV charging bays in Phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. g) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. h) All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development. i) Alterations to the hours of operation from 9.00am - 5.00pm Monday to Saturday, to 7.30am - 7. 00pm Monday to Friday and 8.00am - 7.00pm Saturday to Sunday.
The full report covers all 1,490 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW23A/0161The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report