Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Block 3, R121, Blanchardstown Corporate Park 1, Dublin 15

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 3,143 nearby planning records within 5 km where a location match is available.

Matched source
FW24A/0046
Project type
One-off house
Coverage
5 km radius
3,143Nearby applications
13%Refused
2,721Conditional grants
4Refusal reasons

Top refusal reasons nearby

Other2
Design1
Visual Amenity1

Nearest similar decisions

FW24A/0046

The development will consist of the change of use

Granted0.0 km28 March 2024
FW21A/0117

Modifications to a previously permitted development (Reg Ref. F00A/1299) to include a change of use at first floor level of 'Block 3' from restaurant to office (490 sq.m) with associated internal alterations; minor external works to the building's facade and provision of 8 no. bicycle spaces for the proposed new office use.

Granted0.0 km19 August 2021
FW19A/0146

The development will consist of 3 no. Regus signs and logos with black

Granted0.1 km21 October 2019
FW23A/0348

The development will consist of alterations to the elevations of the existing office building, including: the replacement of all window glazing with new double glazed and full height glazing to the existing curtain walling system, including the provision of extruded pressure caps; installation of new aluminium double glazed curtain walls with tapered/flat metal spandrel panel inserts and the replacement of the existing balustrade with a new balustrade at ground floor located to the south-west and south-east of the building.

Granted0.1 km15 January 2024
FW19A/0060

The construction of a local support facility 'Wellness Centre' compris

Granted0.1 km31 May 2019
FW22A/0055

The development will consist of

Granted0.2 km29 September 2022

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required