Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

75 Hazelbury Green, Castleheany, Dublin 15, D15 XYF7

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

15% of nearby decided applications were refused. The preview found 2,168 nearby planning records within 5 km where a location match is available.

Matched source
FW24A/0047
Project type
One-off house
Coverage
5 km radius
2,168Nearby applications
15%Refused
1,850Conditional grants
1Refusal reasons

Top refusal reasons nearby

Design1

Nearest similar decisions

FW24A/0047

The development will consist of a proposed

Refused0.0 km28 March 2024
FW22B/0022

The development consists of the proposed build-up of existing gable wall to meet newly extended ridgeline and conversion of attic space with new dormer roof to the rear

Granted0.0 km26 April 2022
FW20B/0182

Permission for the proposed build up of existing gable wall to meet newly extended ridgeline and conversion of attic space with new dormer roof to the rear.

Granted0.0 km16 February 2021
FW20B/0085

Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and dutch hip new access staris and flat roof dormer to the rear.

Granted0.1 km03 September 2020
FW21B/0054

Attic conversion, raising of gable end to change roof profile with dormer projecting window to rear and all associated site works.

Granted0.1 km01 June 2021
FW19B/0062

Conversion of existing attic space comprising of modification of exist

Granted0.1 km03 July 2019

The full report covers all 2,168 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required