Permission for Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no.roof windows to the front and flat roof dormer to the rear.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
19 Stralem Terrace, Ongar Park, Dublin, D15 X6F6
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,666 nearby planning records within 5 km where a location match is available.
- Matched source
- FW25A/0023E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Change of existing roof ridge line to extend to new built up gable wal
The development consists of conversion of attic space with extension of roof ridge to form a gable with a new window at 2nd floor level on the side facade with two veludx roof windows to the rear and two velux roof windows to the front.
Conversion of existing attic area including construction of new flat roof dormer structure in rear sloped roof profile, set back from the dwelling footprint perimeters, conversion of the existing hipped roof profile into a gable profile on side elevation, associated internal alterations to facilitate the proposed development together with all ancillary site works & landscaping.
Retention permission for a detached single storey flat roof building consisting of a study room, a playroom and a bathroom to rear.
Retention permission for a detached single storey flat roof building consisting of a study room and storage areas to rear.
The full report covers all 2,666 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW25A/0023EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report