Permission is sought for the installation of 10,400m2 of Photovoltaic (PV) Solar Panels on metal frames at ground level to the east of the campus, an electrical equipment enclosure, fencing, landscaping, underground trenches, and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0007-03). The application relates to the provision of an establishment to which the Major Accident Regulations apply.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Astellas Ireland Co Ltd, Damastown Industrial Park, Dublin, D15 K851
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,262 nearby planning records within 5 km where a location match is available.
- Matched source
- FW25A/0042E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of 2 no. single storey electrical buildings raised approximately 1.5m above ground level, a transformer yard, fencing, underground trenches, landscaping, and other associated site works.
The development consists of retention permission for a 52 sqm detached single storey waste drop off and segregation structure at the north of the site. (A Seveso site.)
Retention permission for a 67 sqm detached single storey fire tender garage located at the south of the site. (A Seveso site)
Retention permission for: (1.) 214 sqm detached single storey office structure at the west of the site; (2.) 42 sqm detached single storey office structure at the north of the site. (A Seveso Site)
The development will consist of an extension and alteration to the existing contractor's compound to include an extended stone and grave contractor's car parking area, the addition of single-storey and two storey site cabins with external stair access and landings, to include site offices, WC's, disabled WC and changing areas, welfare facilities, canteen, workshops, storage and all associated site works.
The full report covers all 2,262 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW25A/0042EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report