Permission for Retention and Completion of a 2 Storey Extension to the rear of the existing administration building to accommodate new laboratory, office and staff locker room facilities and associated site works (change of plan, elevations & building height to that permitted FW24A/0155) all at Viatris Damastown, Damastown Road, Damastown Industrial Estate, Mulhuddart, Dublin 15. The application relates to a development on a site which comprises an activity requiring an integrated pollution prevention and control licence.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Viatris Damastown, Damastown Road, Damastown Industrial Estate, Mulh
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,327 nearby planning records within 5 km where a location match is available.
- Matched source
- FW25A/0045E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The provision of a new 14.7m high warehouse extension (proposed floor
Retention of 2 no. single storey modular buildings located to the north of the existing single storey link coridor and to the north of the 2 storey production building and associated siteworks.
The development will consist of the construction of a new 180 sq/m, 3.
Provision of new single storey 14.7m high extension (area = 174sq/m) t
New construction of a new 235 sq/m, part 6.35 metre high, part 4.35 me
The full report covers all 2,327 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW25A/0045EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report