Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Kyndryl Ireland, Building 5, Technology Campus, Damastown Drive, Damas

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 1,981 nearby planning records within 5 km where a location match is available.

Matched source
FW25A/0234E
Project type
One-off house
Coverage
5 km radius
1,981Nearby applications
14%Refused
1,709Conditional grants
27Refusal reasons

Top refusal reasons nearby

Visual Amenity11
Residential Amenity10
Design2
Density1
Other1

Nearest similar decisions

FW25A/0234E

Kyndryl Ireland Limited, intend to apply for planning permission for a development at: Building 5, Technology Campus, Damastown Drive, Damastown Industrial Park, Dublin 15, D15 K82N. The development will consist of the construction of a new 68 sqm external ESB Substation with incorporated Client Switchroom to the North West of Building 5, with new underground cabling and associated infrastructure to link to ESB infrastructure at Damastown Avenue via wayleave to adjoining site, and all associated site development works above and below ground. Additional Information Received 24/07/25 Clarification of Additional Information received 04/09/25

Granted0.0 km23 September 2025
FW24A/0492E

Planning permission is sought for the following proposal: The proposal comprises the removal of conditions relating to previous planning permissions pertaining to the IBM Technology Campus. The conditions which it is proposed to remove relate to restrictions on the use of buildings within the campus to use by IBM International Holdings as part of their Damastown campus only, and restrictions in respect of the sale or lease of buildings as a separate commercial concern. The proposed development includes the removal of the following conditions; • Reg. Ref.: F04A/0663 – Condition 4 • Reg. Ref.: F05A/0661 – Condition 3 • Reg. Ref.: FW10A/0120 – Condition 5 • Reg. Ref.: FW13A/0115 – Condition 4 • Reg. Ref.: FW18A/0058 – Condition 2 • Reg. Ref.: F04A/1005 – Condition 6 • Reg. Ref.: FW13A/0058 – Condition 4 • Reg. Ref.: FW10A/0196 – Condition 5 • Reg. Ref.: F04A/1301 – Condition 6 • Reg. Ref.: FW11A/0024 – Condition 2 • Reg. Ref.: FW12A/0036 – Condition 4 • Reg. Ref.: FW13A/0126 – Condition 7 • Reg. Ref.: FW13A/0115 – Condition 4 • Reg. Ref.: FW14A/0010 – Condition 6 • Reg. Ref.: FW14A/0057 – Condition 2

Granted0.2 km23 January 2025
FW25A/0207E

The development will consist of material alterations and a change of use in part of the existing ground floor area within an existing manufacturing, testing, warehousing, and office facility. The proposed change of use is from manufacturing to recreational use/staff welfare facilities (including mindfulness room, gym, changing rooms and showers) to provide employee amenity space for the sole use of staff employed at the facility. The development will also include: The installation of a new roller shutter door to the rear of the building; The demolition of an existing link corridor between Building 2 and Building 3, and all associated site works.

Granted0.2 km30 June 2025
FW25A/0422E

Permission for development at Server Buildings 2, 3 and 6 at IBM Technology Campus. The development will consist of the following: a) Construction of three new substations, standalone with a total area of 118 sqm, at rear of the existing Server Buildings 2, 3, and 6 at the IBM Technology Campus. b) Demolition of the two existing corridor links between server buildings 2 and 3. c) New external cladding and doors to match existing finishes d) Demolition of existing substation standalone at southeast side e) Site wide underground utilities upgrade works. f) Landscape alterations to the areas where existing corridor links were demolished, to be replaced with hard landscaping.

Granted0.3 km13 November 2025
FW19A/0003

1. Addition of an automatic vehicle barrier; 2. Relocation of steel

Granted0.3 km04 March 2019
FW18A/0008

The development will consist of alterations to a previously approved D

Granted0.3 km06 March 2018

The full report covers all 1,981 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required