Retention Permission is sought for a 2 storey (4 m x 9 m) extension to rear (north end) also with external steel staircase for access to upper level and all associated works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Dunsinea Lane, Ashtown, Dublin 15, D15 EDP2
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 4,920 nearby planning records within 5 km where a location match is available.
- Matched source
- FW26A/0129E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Development of a residential care houme (nursing home) on lands at Dus
The construction of a single storey extension to the side and rear of
PERMISSION & RETENTION: Planning permission at existing temporary school for developments described as follows. 1. Construction of a single storey temporary prefabricated style school building consisting of 2 classrooms, resource room and toilet areas. 2. The retention of temporary use as primary school in former Castlethorn Construction Suite as granted under planning reference number 2657/15. Temporary planning permission for both described developments for a period not to exceed 31 January 2020 is being sought.
Permission is sought for: 1 no. temporary security hut (c. 7.3 sq. m); and 1 no. new, temporary agricultural gate on the existing driveway to prevent construction access to Ashton House and via River Road. Retention permission is sought for 1 no. temporary car parking area (c. 5,000 sq m), with surface layout made up of 150 mm of clean stone, laid on top of permeable geotextile (Terram T1000), laid on topsoil, and contained by temporary perimeter fencing (Harris fence); and temporary construction vehicle access off Ashtown Road via existing gate and driveway to Ashton House. The proposed carpark is a temporary facility (3 years) to serve the construction workers engaged in the construction of the Rathborne Wharf developments (under construction pursuant to Reg Ref. ABP-312262-21 and ABP-309318-21) within the Dublin City Council administrative area immediately to the east of the site. AI received 23/05/2025 Clarification of Additional Information received 22/08/2025
Change of Use from Retail [Class A1] to Pilates studio [Class C2].
Source match
Matched from public planning record FW26A/0129EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report