Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Castlelands, in the townland of Hampton Demesne, Kilsough North and Ba

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

22% of nearby decided applications were refused. The preview found 1,082 nearby planning records within 5 km where a location match is available.

Matched source
SHD/015/20
Project type
One-off house
Coverage
5 km radius
1,082Nearby applications
22%Refused
848Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SHD/015/20

ABP-313210-22 To view details of this development please visit www.castlelandsshd.com A 10 year planning permission for a Strategic Housing Development. The subject lands are accessed from the Castlelands roundabout to the northwest, to the west by Castleland Park View, Tanners Water Lane to the south and Pinewood Green to the north; bound by the Dublin- Belfast trainline and the R127 Skerries Road to the east, adjacent residential areas of Pinewood Green to the north and Ardgillen to the west. The application site is 25.33 hectares in size. The proposed development consists of 817 no. residential units comprising of 162 no. 1-bed units, 250 no. 2-bed units (180 no. 2-bed apartments and 70 no. 2-bed houses), 381 no. 3-bed units (72 no. 3-bed apartments, 26 no. 3 bed duplexes and 283 no. 3-bed houses) and 24 no. 4 bed houses ranging in height from 1 - 6 no. storeys on an overall site of 25.33 ha. The residential neighbourhoods are set out as follows: • Neighbourhood 1 consists of 242 units varying between 2 and 6 storeys in height • Neighbourhood 2 consists of 163 units varying between 2 and 3 storeys in height • Neighbourhood 3 consists of 153 units varying between 2 and 3 storeys in height • Neighbourhood 4 consists of 103 units 2 storeys in height • Neighbourhood 5 consists of 156 units 2 storeys in height The proposed development will also provide for 1 no. creche facility (869sqm) including a 237 sqm outdoor play area and 1 no. retail unit (616 sqm) and an office (155 sqm) located in Neighbourhood 1. The proposed development provides for the completion of the Castlelands Link Street, which extends to approximately 870 metres in length from the existing Castlelands roundabout in the west to the Skerries Road (R127) in the east. It provides for access to the residential development and includes a bridge over the existing railway line, and the realignment of part of the existing Skerries Road. This road will incorporate footpath and cycle tracks on both sides of the carriageway. The development also includes a network of internal roads serving the development. 1,033 no. car parking spaces are proposed to serve the development (1,010 residential and 23 spaces for the proposed creche and retail unit) located at surface level. 1092 no. bicycles spaces are proposed to serve the entire development. This consists of 812 no. long stay spaces to serve the proposed apartment/ duplex units and 280 no. shorts stay spaces to serve visitors to the proposed development. 2.16 Hectares of public open space is proposed to serve the future residents of the scheme which equates to c. 11.8% of the net developable area. 0.83 Hectares of communal open space is being provided to serve the residents of the proposed apartment units. The development will also provide for all associated ancillary site development infrastructure including: ESB sub-stations, bike stores, bin stores, plant rooms, public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments; associated scheme signage, and all associated engineering and site works, including a temporary diversion of the R127, necessary to facilitate the development. The existing overhead infrastructure will be diverted underground. An Environmental Impact Assessment Report has been prepared in respect of the application and accompanies this application. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.

Granted0.0 km21 March 2023
F20B/0028

Retention for a temporary period of three years of the single storey log cabin / garden room (10m²) for use as an amenity space by the applicant, located adjacent to the eastern boundary within the rear garden of the existing dwelling.

Granted0.4 km26 March 2020
F21A/0610

Permission for works to an existing dwelling comprising a single storey extension to the rear, a single storey extension to the front and side incorporating a new front porch, the widening of the existing vehicular entrance and for all associated siteworks.

Granted0.4 km17 January 2022
F21A/0576

The proposed development consists of advance infrastructure works on a 1.57 ha site at Castlelands, Balbriggan to facilitate intended future community facilities and residential development on lands zoned for residential use, to the east of the subject site, which will be the subject of separate planning applications. These infrastructural works include: 1. Construction of the first section of the proposed Castlelands link street from the existing Castlelands roundabout to the west for c. 420m to its junction with a north south neighbourhood street providing access to the FCC masterplan proposed school and swimming pool and to the local park and to the future Neighbourhood 5 in the proposed future residential development. This street to include dedicated footpaths and cycle lanes. 2. From its junction with the Castlelands Link Street, construction c. 130m of a north-south neighbourhood street providing access to the FCC masterplan proposed swimming pool car park, and to the proposed local park and Neighbourhood 5 in the proposed future residential development. 3. Foul, Surface Water and Water Supply Services to facilitate future community facilities and residential development within the Castlelands Masterplan Area. 4. Planting & landscaping of open space areas immediately adjoining proposed streets. Provision of Public Lighting along both Link street and neighbourhood street. 5. All associated and ancillary works. An Environmental Impact Assessment Report has been prepared in respect of the proposed development and accompanies this application.

Granted0.4 km14 December 2021
F22A/0219

Revision to previously approved planning permission registration reference F18A/0098 to revise dwelling design with modifications to roof form and height, fenestration, footprint and rooflights.

Granted0.5 km22 June 2022
F18A/0098

Relocation of existing vehicular entrance

Granted0.5 km26 April 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required