Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 437 decisions within 5 km, 7 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the demolition of an existing dwelling house and permission is also sought for the construction of a replacement dwellinghouse, domestic garage, effluent treatment system and all associated site works (gross floor space 167sqm)
For extension/renovations to existing dwelling house as constructed and all associated site works. Gross floor space of work to be retained 24.00sqm
Of •existing dwellings (eircodes H65TH24 and H65HR92) on revised boundaries, •partial demolition of existing single storey shed,•construction of 2no. semi-detached single storey dwellings,•provision of car parking, accessed from internal access road granted under Pl. Reg Ref 2261303 / ABP Ref. 316109-23,• service connections and all other ancillary site and development works
For amendments to the development permitted under ABP Ref. 316109-23 / Pl. Reg Ref 2261303. The proposed amendments consist of; retention and extension of single storey dwelling designated for demolition under ABP Ref. 316109-23 / Pl. Reg Ref 2261303, alterations to access road, parking and communal open space and all associated development works
Of the construction of a new educational campus that will comprise of two school buildings. Gaelscoil Riada a part one & two-storey, 16 classroom primary school with single class base SEN & ancillary spaces with total floor area of circa 2890sqm. Colaiste an Eachraidh a part one, two & three-storey post primary school with 17 general classrooms, 12 specialist classrooms, sports hall, single class base SEN & ancillary spaces with a total floor area of circa 6985sqm. Proposed site works to include the construction of standalone ESB substation & bin store, 2no. plant enclosures, all new hard play areas, shared central grass play area, general purpose external amenity spaces, access road with lay-by set down, 84no. carparking spaces, 48no. covered bicycle stands, ancillary infrastructure works, including new vehicular access points & new pedestrian access, together with new boundary treatments & landscaping works
For the development consisting of: the demolition of the existing, vacated, two storey, former Clarin College school buildings, including all permanent and ancillary structures, existing footings and hardstanding within the site; as well as the removal of all disused on site drainage system and utility services, including any existing underground attenuation tanks. Gross floor space of any demolition: 4,450 sqm
The brief summarizes the pattern across all 437 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171612The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief