Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 435 decisions within 5 km, 1 exact-site or onsite candidate record, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For development consisting of a new 2 -storey 11,386sqm Post-Primary School, including a 2-classroom Special Needs Unit, incorporating Sports Hall; Classrooms; General Purpose Hall and all ancillary pupil and staff facilities; with all associated site works; a new sub-station; 92 number car parking spaces; ballcourts; hard and soft play areas and landscaping: including a new pedestrian/cycle path along the R348 and modifications to existing vehicular bridge into the site. Gross floor space of proposed works 11,386sqm.
To construct the following (a) an extension to the existing car park and (b) a bring (bottle) bank at Athenry Shopping Centre (gross floor space 3740sqm). Previous Planning Ref. No. 13/240
To demolish the existing roofed sheep penning/sales shed and re-erect a new sheep penning/sales shed on the footprint of the existing sheep penning/sales shed. Gross floor space of proposed works 2231 sqm.
For development at a c. 0.0057 ha site in the car park of Athenry Shopping Centre (Tesco). The development will consist of: (i) the construction of a shelter canopy (c. 35 sqm) in the existing car park for the purpose of providing 2 no dedicated "Click and Collect" spaces for the existing store; and (ii) signage and all associated site development works.
For development comprising the decommissioning of the existing, private on-site waste water treatment system to include remedial site works and a proposed connection to the public waste water treatment system to facilitate construction of 19 no. two storey 3 bed residential dwellings and 9 no. 2 storey 2 bed residential dwellings and provision of car parking, open space, landscaping and associated site works. Gross floor space of proposed works 2906 sqm.
Of the existing pedestrian accessway to the new Clarin College
The brief summarizes the pattern across all 435 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 171875The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief