Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 427 decisions within 5 km, 1 exact-site or onsite candidate record, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
Extension of duration 07/443 continued operation of a sand, gravel,stone and rock quarry on 14.4 hectares of land. The permission is sought for a period of 30 years. The development is for the provision of aggregate materials by extraction,for construction purposes etc
Continuance of use of existing premises comprising of offices, precast concrete manufacturing plant, wastewater treatment plant and ancillary works including yard, concrete batching plant, storage silos/tanks, aggregate storage bays and gantry crane (previously granted permission Ref. 08/1396 - PL09.233654)
The building of a dormer type dwelling with single storey annex, to be serviced with small on site wastewater treatment system to current EPA guidelines and for all associated siteworks including planning permission for upgrade/replacement onsite wastewater treatment system to current EPA guidelines in lieu of the existing septic system serving the existing dwelling adjacent (belonging to my parents). The proposed dwelling will be accessed via the existing shared entrance and driveway serving my parents dwelling,
To construct 1) A single storey bungalow type dwelling which will incorporate a family flat to be occupied by my brother Alan Cullen, who requires supervised independent living accommodation. 2) A secondary sewage treatment system with percolation area. 3) A bored well. 4) All associated ancillary ground works. This site will be accessed from the public road via my parents existing driveway under an agreed right of way arrangement. All of the above works on my site
Construction of new 216 sq.mt dormer-storey house, with 71 sq.mt. basement garage, wastewater treatment unit & percolation area, amendments to existing entrance and associated works
The construction of new 216sqm dormer-storey house, wastewater treatment unit and percolation area, amendments to existing entrance and associated works
The brief summarizes the pattern across all 427 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181584The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief